Moorsholm to Liverton Road stabilisation
RamwallOWNER: Redcar & Cleveland Borough Council
DESIGNER: OTB Engineering Ltd
CONTRACTOR: TBC
PURPOSE: Retaining toe walls along re-graded embankments
RAMWALL TYPE: 8m diameter 200mm x 200mm galvanised RAMWALL mesh plus 5m diameter, 50mm x 50mm galvanised facing mesh, 25mm rebar spikes
RAMWALL FILL: TBC
NCD International has been asked by Redcar & Cleveland Borough Council to propose a RAMWALL solution to the stabilisation of the Moorsholm to Liverton road where it has been closed due to a landslip in the colluvial material overlying rockhead. The design solution involves the removal of material below the road and rebuilding by founding it directly on the rock using tiers of RAMWALL installed to a height of about 5-metres.
Work is due to commence in the summer of 2010.